Saturday, 12 March 2011

building up

Time in the AV Lab yesterday yielded some new developments in the second image that hopefully illustrate more clearly the intended layout of the composite:


The pseudo-clover thing hovering at the top right will be the port on the right structure for the bridge that will connect the two structures. The tanks at the bottom will be considerably reshuffled; they provide interesting forms but they're not helping much to make the image look highly elevated. Weathered stone contrasting with drab metal will be the two main materials, though I'm thinking I'll try to reverse the typical uses associated with them.